Milliken Infrastructure Solutions   /     Case Study: Cincinnati, Ohio

Description

The final episode in the podcast series explores a sanitary sewer rehabilitation project in Cincinnati, Ohio. During an assessment of their combined sewer system, the Metropolitan Sewer District of Greater Cincinnati (MSD) discovered that an 800 ft section of stacked stone and brick sewer line, situated in an area of with active natural springs, was badly leaking. Records indicated that the old stone pipe was likely installed in phases between 1870 and 1890. This podcast will discuss how the MSD addressed challenges and completed repairs.

Summary

The final episode in the podcast series explores a sanitary sewer rehabilitation project in Cincinnati, Ohio. During an assessment of their combined sewer system, the Metropolitan Sewer District of Greater Cincinnati (MSD) discovered that an 800 ft section of stacked stone and brick sewer line, situated in an area of with active natural springs, was badly leaking. Records indicated that the old stone pipe was likely installed in phases between 1870 and 1890. This podcast will discuss how the MSD addressed challenges and completed repairs.

Subtitle
The final episode in the podcast series explores a sanitary sewer rehabilitation project in Cincinnati, Ohio. During an assessment of their combined sewer system, the ...
Duration
00:13:56
Publishing date
2015-09-17 14:22
Link
http://millikeninfrastructure.podbean.com/e/case-study-cincinnati-ohio/
Contributors
  Milliken Infrastructure Solutions, LLC
author  
Enclosures
http://millikeninfrastructure.podbean.com/mf/feed/jnsir9/5Cincinnati_1-2_MP3_128kbit_44kHz_stereo.mp3
audio/mpeg

Shownotes

The final episode in the podcast series explores a sanitary sewer rehabilitation project in Cincinnati, Ohio. During an assessment of their combined sewer system, the Metropolitan Sewer District of Greater Cincinnati (MSD) discovered that an 800 ft section of stacked stone and brick sewer line, situated in an area of with active natural springs, was badly leaking. Records indicated that the old stone pipe was likely installed in phases between 1870 and 1890. This podcast will discuss how the MSD addressed challenges and completed repairs.