At The Meeting... With The Morrison Group   /     SwineCast 0941, ATM - PRRS Time To Stability Research and Control Protocols - Part 3 of 3

Description

SwineCast 0941 Show Notes:This three episode At The Meeting series looking at PRRS type 174 concludes as The Morrison Group, joined by Boehringer Ingelheim's Dr. Reid Phillips, discuss recent Time To Stability research and the latest on PRRS control.

Summary

SwineCast 0941 Show Notes: This three episode At The Meeting series looking at PRRS type 174 concludes as The Morrison Group, joined by Boehringer Ingelheim's Dr. Reid Phillips, discuss recent Time To Stability research and the latest on PRRS control.

Subtitle
SwineCast 0941 Show Notes: This three episode At The Meeting series looking at PRRS type 174 concludes as The Morrison Group, joined by Boehringer Ingelheim's Dr. Reid Phillips, discuss recent Time To Stability research and the latest on PRRS control.
Duration
Publishing date
2016-10-26 16:32
Link
http://feedproxy.google.com/~r/AtTheMeetingAudio/~3/9F9TL3I2ts4/swinecast-0941-atm-prrs-time-to-stability-research-and-control-protocols
Contributors
  The Morrison Group
author  
Enclosures
http://traffic.libsyn.com/animalcast/161020_SwineCast_0941.mp3
audio/mpeg